Capture the tender

Every line traces to a page

Each requirement keeps its source filename and page number, so a reviewer can jump straight back to the clause.

EstiWright — Requirements
RefTextSourcePage
3.1HVAC for all occupied floors…marina-tower-rfp.pdf3
4.2LV distribution with N+1…marina-tower-rfp.pdf4
5.4Structured cabling Cat6A…marina-tower-rfp.pdf5
AuditRequirements

A hand-built mock in the site theme, modelled on the real screen and populated with our demo tenant's data — not a screenshot. Hover to pause.

More in Capture the tender

Keep going

EstiWright — Drop the tender in
marina-tower-rfp.pdf10 pages · rfp · Marina Tower — MEP Fit-out
1Upload2Analyse3RFI4Compliance5Export

Drop the tender in

Upload the RFP and EstiWright pins the tender number, page count and source file before anything else happens.

EstiWright — Requirements
RefDisciplineTextPage
3.1mechanicalHVAC for all occupied floors per ASHRAE 62.1.3
4.2electricalLV distribution with N+1 redundancy on risers.4
5.4elvStructured cabling Cat6A to every workstation.5
1Upload2Analyse3RFI4Compliance5Export

Extract the requirement register

One pass over the tender produces a structured register — reference, discipline, mandatory flag and source page.

EstiWright — Requirements
3.1 · HVAC per ASHRAE 62.1 Mandatory
4.2 · LV N+1 redundancy Mandatory
5.4 · Cat6A to workstations Optional

Mandatory versus optional

Every requirement carries an explicit mandatory flag, so nothing binding is left to memory.

See this on your own tender.

We'll run your RFP through the same pipeline and show you the output.